{"query_echo":{"q":"","filters":{"analysis_type":["siting strategy"]},"warnings":[{"code":"facet_value_not_in_vocabulary","message":"Value 'siting strategy' for facet 'analysis_type' is not in the controlled vocabulary."}]},"total":{"value":1,"relation":"eq"},"page":1,"page_size":20,"self":"https://climateinsightsdirectory.org/api/v1/search?analysis_type=siting+strategy","stability":"beta","ai_marking":{"digital_source_type":{"uri":"http://cv.iptc.org/newscodes/digitalsourcetype/trainedAlgorithmicMedia","name":"Created using Generative AI"},"notice":"Summary and key insights are generated using artificial intelligence."},"results":[{"id":"eninnova-000239","url":"https://climateinsightsdirectory.org/document/eninnova-000239","title":"SITING RENEWABLE GENERATION: THE NORTHEAST PERSPECTIVE","publisher":{"name":"Energy Innovation","organization":"energy-innovation"},"document_type":"report","language":"en","date_published":"2017-03","source_url":"https://energyinnovation.org/wp-content/uploads/northeastsitingperspective_steinoboyle.pdf","generator":"Climate Insights Directory","generated_fields":["summary","key_insights","climate_tags","geography_discussed","analysis_type"],"summary":{"text":"The report addresses the conflict between the Northeastern U.S.'s aggressive renewable energy targets and its limited available land. It argues that meeting these goals requires a combination of innovative siting on low-conflict lands (such as brownfields and prison lands), the acceleration of offshore wind, the use of distributed energy resources, and the import of Canadian hydroelectricity. The authors emphasize that overcoming local opposition through early community engagement and 'Smart from the Start' principles is critical to avoiding project delays and failures.","ai_generated":true,"unit":"eninnova-000239#summary","date_modified":"2026-10-23"},"key_insights":[{"text":"The Northeastern U.S. faces a significant challenge in balancing ambitious renewable energy goals with severe land constraints. Seven states in the region—Massachusetts, Vermont, Rhode Island, Maine, New Hampshire, Connecticut, and New York—have binding carbon reduction goals that could result in approximately 42 percent of the region's energy coming from renewable sources by 2030, up from 20 percent in 2015.","ai_generated":true,"unit":"eninnova-000239#insight-1","date_modified":"2026-10-23"},{"text":"Local opposition and zoning regulations create substantial barriers to utility-scale renewable development. In New York, some town councils have used six-month moratoriums on meteorological towers to effectively block wind development by preventing the collection of data required by state law. Developers estimate that while a four-year permitting process is a best-case scenario, obtaining all permissions and overcoming opposition for a wind farm can take up to eight years.","ai_generated":true,"unit":"eninnova-000239#insight-2","date_modified":"2026-10-23"},{"text":"Offshore wind is identified as a primary solution to minimize siting objections and place generation near load centers. The report highlights Massachusetts's Act Relative to Energy Diversity, which reduces developer risk by carving out special development areas more than ten miles from inhabited areas and requiring utilities to contract for 1,600 MW of new offshore wind projects.","ai_generated":true,"unit":"eninnova-000239#insight-3","date_modified":"2026-10-23"},{"text":"Distributed energy resources (DER) and community-based projects can reduce the demand for large-scale, land-intensive utility projects. Community distributed generation (DG) is particularly noted for providing equitable access to renters and low-income customers and offering cost advantages; non-residential solar DG systems are estimated to be 13-38 percent less expensive than average residential systems.","ai_generated":true,"unit":"eninnova-000239#insight-4","date_modified":"2026-10-23"},{"text":"Importing Canadian hydroelectricity is presented as a viable way to decarbonize the Northeastern grid. The report cites the Minnesota-Manitoba Great Northern Transmission Line (GNTL) as a successful model of international collaboration that brings 883 MW of Canadian hydro into Minnesota through early stakeholder engagement and the use of 'Smart from the Start' principles.","ai_generated":true,"unit":"eninnova-000239#insight-5","date_modified":"2026-10-23"},{"text":"The report suggests utilizing underused or contaminated land to avoid conflicts with agricultural or wilderness areas. This includes 'Brightfields' (capped landfills or former brownfields), where the EPA identifies 80,000 potential sites nationally, as well as state-owned prison lands, as seen in Maryland and New York.","ai_generated":true,"unit":"eninnova-000239#insight-6","date_modified":"2026-10-23"}],"climate_tags":["renewable energy","offshore wind power","distributed generation","Community solar farm","hydroelectricity","electric power transmission","land-use planning","energy efficiency","demand response","environmental justice"],"geography_discussed":["New York","Massachusetts","Canada","Minnesota","Maryland","Vermont","Rhode Island","Maine","New Hampshire","Connecticut"],"frame_perspective":[],"analysis_type":["policy analysis","siting strategy"]}]}