{"query_echo":{"q":"","filters":{"analysis_type":["monitoring and evaluation framework"]},"warnings":[{"code":"facet_value_not_in_vocabulary","message":"Value 'monitoring and evaluation framework' for facet 'analysis_type' is not in the controlled vocabulary."}]},"total":{"value":2,"relation":"eq"},"page":1,"page_size":20,"self":"https://climateinsightsdirectory.org/api/v1/search?analysis_type=monitoring+and+evaluation+framework","stability":"beta","ai_marking":{"digital_source_type":{"uri":"http://cv.iptc.org/newscodes/digitalsourcetype/trainedAlgorithmicMedia","name":"Created using Generative AI"},"notice":"Summary and key insights are generated using artificial intelligence."},"results":[{"id":"glorespar-000084","url":"https://climateinsightsdirectory.org/document/glorespar-000084","title":"GLOBAL RESILIENCE PARTNERSHIP INDICATOR GUIDANCE 2024-2029","publisher":{"name":"Global Resilience Partnership","organization":"global-resilience-partnership"},"document_type":"guide","language":"en","date_published":"2025-07","source_url":"https://www.globalresiliencepartnership.org/wp-content/uploads/2025/07/grp-indicator-guidance-2024-2029_july-2025.pdf","generator":"Climate Insights Directory","generated_fields":["summary","key_insights","climate_tags","analysis_type"],"summary":{"text":"The Global Resilience Partnership (GRP) Indicator Guidance 2024-2029 establishes a standardized monitoring and evaluation framework for its grantees and partners. The framework is structured around four core indicators (CORE1-4) and three thematic work areas: Innovation (INN1-6), Knowledge (KNO1-3), and Policy (POL1-3). Core indicators track people supported, investments mobilised, people more resilient, and organisations supported. The guidance specifies mandatory reporting requirements, data calculation methods, and disaggregation standards, particularly for sex, age, and disability. It defines 'resilience' as the ability to persist in crises, adapt to risks, and transform positively. The document also aligns these metrics with USAID and UK ICF indicators to ensure international reporting compatibility.","ai_generated":true,"unit":"glorespar-000084#summary","date_modified":"2026-10-23"},"key_insights":[{"text":"The GRP framework utilizes four core indicators to track overall progress, with CORE1 (People supported) and CORE2 (Investments mobilised) being mandatory for all grantees.","ai_generated":true,"unit":"glorespar-000084#insight-1","date_modified":"2026-10-23"},{"text":"CORE3 (People more resilient) is a mandatory impact indicator specifically for 'Scale grantees' receiving between USD 250,000 and USD 1,500,000, while remaining optional for others due to its complex reporting requirements, such as the need for control groups.","ai_generated":true,"unit":"glorespar-000084#insight-2","date_modified":"2026-10-23"},{"text":"The GRP defines resilience as \"the ability to persist in prolonged crises, adapt to and manage risks from sudden events and to transform positively in the face of change\".","ai_generated":true,"unit":"glorespar-000084#insight-3","date_modified":"2026-10-23"},{"text":"Innovation indicators (INN1-6) track a range of outcomes including land area under innovation (measured in hectares), CO2 emissions reduced or avoided (tCO2e), jobs created (Full-Time Equivalent), and the value of financial services provided in USD.","ai_generated":true,"unit":"glorespar-000084#insight-4","date_modified":"2026-10-23"},{"text":"Knowledge indicators (KNO1-3) measure the generation of knowledge products and events, the number of people accessing those products, and the number of people who have completed training based on a defined curriculum.","ai_generated":true,"unit":"glorespar-000084#insight-5","date_modified":"2026-10-23"},{"text":"Policy indicators (POL1-3) track the lifecycle of resilience-related policies through three stages: engagement (analysis or consultation), formal proposal or adoption, and effective implementation.","ai_generated":true,"unit":"glorespar-000084#insight-6","date_modified":"2026-10-23"}],"climate_tags":["climate change adaptation","climate change mitigation","climate resilience","climate finance","carbon sequestration","early warning system","Sustainable land management","capacity building","climate bond"],"geography_discussed":[],"frame_perspective":[],"analysis_type":["monitoring and evaluation framework","indicator guidance"]},{"id":"wwf-000955","url":"https://climateinsightsdirectory.org/document/wwf-000955","title":"ESMP","publisher":{"name":"WWF International","organization":"wwf-international"},"document_type":"report","language":"ur","date_published":null,"source_url":"https://www.worldwildlife.org/documents/2427/ESMP_Activity_1.1.2_Urdu.pdf","generator":"Climate Insights Directory","generated_fields":["summary","key_insights","climate_tags","analysis_type"],"summary":{"text":"The ESMP outlines the environmental and social safeguards for a project involving the dredging of 415 meters of water flow paths, cleaning of one pond, and strengthening of 211 meters of embankments in Dabri village, DI Khan. It identifies risks such as soil erosion, land sliding, and restricted community access to water, proposing mitigation measures including the construction of five check dams to control flow velocity and reduce erosion. The plan mandates the use of Personal Protective Equipment (PPE) for workers, the establishment of a Community-Based Organization (CBO) for local participation, and a four-tier Grievance Redress Mechanism (GRM). A long-term Operation and Maintenance (O&M) plan is set for 2027-2031 to ensure the sustainability of the 29,404 cubic meter water storage capacity.","ai_generated":true,"unit":"wwf-000955#summary","date_modified":"2026-10-23"},"key_insights":[{"text":"The project involves specific physical interventions: dredging 415 meters of water flow paths, cleaning one pond, and strengthening 211 meters of embankments to improve water storage capacity to 29,404 cubic meters.","ai_generated":true,"unit":"wwf-000955#insight-1","date_modified":"2026-10-23"},{"text":"Occupational Health and Safety (OHS) measures are mandated, including the provision of Personal Protective Equipment (PPE) such as helmets, gloves, and boots, and the requirement for first aid kits to be available on-site.","ai_generated":true,"unit":"wwf-000955#insight-2","date_modified":"2026-10-23"},{"text":"A structured community engagement strategy is implemented, including the creation of a Community-Based Organization (CBO) to ensure local ownership and the use of Free, Prior and Informed Consent (FPIC) for indigenous and local communities.","ai_generated":true,"unit":"wwf-000955#insight-3","date_modified":"2026-10-23"},{"text":"The project's long-term sustainability is managed through an Operation and Maintenance (O&M) plan spanning 2027 to 2031, focusing on annual inspections of embankments and the removal of silt and debris before the monsoon season.","ai_generated":true,"unit":"wwf-000955#insight-4","date_modified":"2026-10-23"}],"climate_tags":["ecosystem-based adaptation","water management","soil erosion","climate change adaptation","Environmental and Social Safeguards","nature-based solutions"],"geography_discussed":[],"frame_perspective":[],"analysis_type":["environmental and social impact assessment","mitigation plan","monitoring and evaluation framework"]}]}