{"query_echo":{"q":"","filters":{"analysis_type":["Procurement Document"]},"warnings":[{"code":"facet_value_not_in_vocabulary","message":"Value 'Procurement Document' for facet 'analysis_type' is not in the controlled vocabulary."}]},"total":{"value":2,"relation":"eq"},"page":1,"page_size":20,"self":"https://climateinsightsdirectory.org/api/v1/search?analysis_type=Procurement+Document","stability":"beta","ai_marking":{"digital_source_type":{"uri":"http://cv.iptc.org/newscodes/digitalsourcetype/trainedAlgorithmicMedia","name":"Created using Generative AI"},"notice":"Summary and key insights are generated using artificial intelligence."},"results":[{"id":"greenca-000009","url":"https://climateinsightsdirectory.org/document/greenca-000009","title":"REQUEST FOR QUALIFICATION DOCUMENT PUBLIC PRIVATE PARTNERSHIP FOR THE ESTABLISHMENT OF A REGIONAL LANDFILL FOR THE EDEN DISTRICT MUNICIPALITY IN THE MOSSEL BAY AREA INCLUDING ALTERNATIVE WASTE TREATMENT TECHNOLOGY OPTIONS","publisher":{"name":"GreenCape","organization":"greencape"},"document_type":"report","language":"en","date_published":"2014-10-01","source_url":"https://greencape.co.za/assets/0829-RFQ-revision-5-FINAL.pdf","generator":"Climate Insights Directory","generated_fields":["summary","key_insights","climate_tags","geography_discussed","analysis_type"],"summary":{"text":"The Eden District Municipality (EDM) is seeking a private partner for a 10-year PPP to develop, finance, and operate a regional landfill in the Mossel Bay area to serve Bitou, George, Knysna, and Mossel Bay. The project includes the bulk transfer of waste from George, Knysna, and Bitou, and the implementation of alternative waste treatment (AWT) technologies to reduce landfill volumes. The regional landfill is designed for a 50-year lifetime, with initial cells covering 200 ha and reaching 12m above ground level. Bidders must demonstrate technical and financial capacity, including a minimum of 70 points on a technical evaluation scale, and provide proof of B-BBEE compliance and tax clearance.","ai_generated":true,"unit":"greenca-000009#summary","date_modified":"2026-10-23"},"key_insights":[{"text":"The project aims to establish a regional landfill to replace the PetroSA landfill site, which is rapidly losing airspace, with a short-term extension of the PetroSA agreement valid until December 2015.","ai_generated":true,"unit":"greenca-000009#insight-1","date_modified":"2026-10-23"},{"text":"The proposed regional landfill will have a total footprint of approximately 200 ha, with a maximum height of 12 m above natural ground level and an excavation depth of 6 m below natural ground level.","ai_generated":true,"unit":"greenca-000009#insight-2","date_modified":"2026-10-23"},{"text":"The landfill is designed for a total lifetime of approximately 50 years, although the initial construction will focus on a 12-year lifetime cell, potentially split into two 6-year cells.","ai_generated":true,"unit":"greenca-000009#insight-3","date_modified":"2026-10-23"},{"text":"The PPP is set for a 10-year term, during which the cost of developing the landfill and alternative waste treatment facilities must be recovered.","ai_generated":true,"unit":"greenca-000009#insight-4","date_modified":"2026-10-23"},{"text":"The project includes the bulk transfer of waste from transfer stations in George, Knysna, and Bitou to the regional landfill, while Mossel Bay will transport waste directly from collection to the site.","ai_generated":true,"unit":"greenca-000009#insight-5","date_modified":"2026-10-23"},{"text":"Bidders are encouraged to propose alternative waste treatment (AWT) technologies to reduce waste volumes, preferably at no additional cost to the EDM.","ai_generated":true,"unit":"greenca-000009#insight-6","date_modified":"2026-10-23"},{"text":"The regional facility must include separate cells for general waste and hazardous waste, with the latter catering to low to medium hazard ratings such as solvents, paints, and sewage sludge.","ai_generated":true,"unit":"greenca-000009#insight-7","date_modified":"2026-10-23"},{"text":"The project requires the provision of a mobile crushing and screening plant for builder's rubble that will rotate monthly through the municipalities.","ai_generated":true,"unit":"greenca-000009#insight-8","date_modified":"2026-10-23"},{"text":"The Development Bank of South Africa (DBSA) holds a first right of refusal to offer loan financing for the project.","ai_generated":true,"unit":"greenca-000009#insight-9","date_modified":"2026-10-23"},{"text":"To proceed to the Request for Proposals (RFP) phase, bidders must achieve a minimum of 70 points based on technical, operational, management, and financial evaluation criteria.","ai_generated":true,"unit":"greenca-000009#insight-10","date_modified":"2026-10-23"}],"climate_tags":["landfill","waste management","public–private partnership","recycling"],"geography_discussed":["Bitou Local Municipality","George","Knysna","Oudtshoorn","Kannaland Local Municipality","Hessequa Local Municipality","South Africa"],"frame_perspective":[],"analysis_type":["procurement document"]},{"id":"cdkn-000795","url":"https://climateinsightsdirectory.org/document/cdkn-000795","title":"REQUEST FOR TECHNICAL AND FINANCIAL PROPOSALS NATIONAL CLIMATE CHANGE RESPONSE STRATEGY – ACTION PLAN SUBCOMPONENT 8: IN RESPECT OF THE PROVISION OF CONSULTANCY SERVICES FOR DESIGNING A NATIONAL CLIMATE CHANGE FINANCIAL MECHANISM","publisher":{"name":"Climate and Development Knowledge Network","organization":"climate-and-development-knowledge-network"},"document_type":"briefing","language":"en","date_published":"2011-02","source_url":"https://www.cdkn.org/wp-content/uploads/2011/03/Subcomponent-8-Finance.pdf","generator":"Climate Insights Directory","generated_fields":["summary","key_insights","climate_tags","analysis_type"],"summary":{"text":"This document is a request for technical and financial proposals issued in February 2011 by the Ministry of Environment and Mineral Resources of the Republic of Kenya. It outlines the terms of reference for consultancy services to design a national climate change financial mechanism, which constitutes 'Subcomponent 8' of a broader National Climate Change Response Strategy (NCCRS) Action Plan.","ai_generated":true,"unit":"cdkn-000795#summary","date_modified":"2026-08-17"},"key_insights":[{"text":"Kenya identifies itself as highly vulnerable to climate change because its primary economic drivers—including agriculture, livestock, tourism, forestry, and fisheries—are climate-sensitive, and the country possesses low adaptive capacity.","ai_generated":true,"unit":"cdkn-000795#insight-1","date_modified":"2026-08-17"},{"text":"The Government of Kenya is developing a comprehensive Climate Change Action Plan consisting of eight interrelated subcomponents: (1) Long-term National Low Carbon Development Pathway, (2) Enabling Policy and Regulatory Framework, (3) National Adaptation Plan, (4) Nationally Appropriate Mitigations Actions (NAMAs), (5) Research and Development and Technology Transfer, (6) National Performance and Benefit Measurement, (7) Knowledge Management and Capacity Development, and (8) Finance.","ai_generated":true,"unit":"cdkn-000795#insight-2","date_modified":"2026-08-17"},{"text":"Subcomponent 8 specifically aims to create an innovative national climate change financial mechanism to help the country access various funding sources. The required design must include a fund set-up and management system, an investment strategy/framework, eligibility criteria, a coordinated carbon trading platform, and a resource mobilization and capacity development plan.","ai_generated":true,"unit":"cdkn-000795#insight-3","date_modified":"2026-08-17"},{"text":"The consultancy for the financial mechanism is structured in two stages. Stage 1 focuses on reviews, including an assessment of global and national fund management, existing climate-related finance sources, carbon market coordination options, and institutional absorptive capacity. Stage 2 involves the detailed design of the financial mechanism and its policy and regulatory framework, with recommendations for delivery at the county level.","ai_generated":true,"unit":"cdkn-000795#insight-4","date_modified":"2026-08-17"},{"text":"The Ministry of Environment and Mineral Resources serves as the lead agency for the Action Plan, supported by an Inter-ministerial Task Force that includes the Office of the Prime Minister and the Ministries of Finance, National Planning and Vision 2030, Agriculture, and Northern Kenya and ASALs.","ai_generated":true,"unit":"cdkn-000795#insight-5","date_modified":"2026-08-17"}],"climate_tags":["climate finance","adaptation","mitigation","carbon markets","national climate change response strategy"],"geography_discussed":[],"frame_perspective":[],"analysis_type":["Terms of Reference","Procurement Document"]}]}